It covers the contractors who will operate such public works as road, bridges etc. and covers both Property Damage (Section I) and Third Party Liability (Section II) Insurance from the time of collecting construction material to the construction site to the time of handover after the contract works. Section II limit can be proposed up to 50%, 75%, 100% or 125% of Section I of which the sum insured is contract value. The value of machines and equipments at the site can be added to sum insured. The period of insurance is from minimum 3 months to maximum 5 years. Maintenance period can be proposed for 3 months, 6 months or 1 year. The premium rate ranges from 0.15% to 0.518%.
379088, 384865, 252372, 246902
384881, 384876, 386919
384870, 384868
379188
251764, 384874, 384867
251761
384864, 384873